In this paper we present a destructive lower bound for a number of resource constrained project scheduling (RCPS) problems, which is based on column generation. We first look at t...
J. M. van den Akker, Guido Diepen, J. A. Hoogeveen
Engineering design increasingly uses computer simulation models coupled with optimization algorithms to find the best design that meets the customer constraints within a time con...
Wind energy has an increasing influence on the energy supply in many countries, but in contrast to conventional power plants it is a fluctuating energy source. For its integration...
In this paper, we utilize a predator-prey model in order to identify characteristics of single-objective variation operators in the multi-objective problem domain. In detail, we a...
Christian Grimme, Joachim Lepping, Alexander Papas...
The deterministic Multi-step Crossover Fusion (dMSXF) is an improved crossover method of MSXF which is a promising method of JSP, and it shows high availability in TSP. Both of th...