This paper reports work to support dependability arguments about the future reliability of a product before there is direct empirical evidence. We develop a method for estimating ...
This paper describes two results of the European ESPRIT project no. 22828 ,,CSCCM", which aims at optimising the bidding process of small and medium companies in the construc...
Introducing enterprise information systems (EIS) is usually associated with high costs. It is therefore crucial to understand those factors that determine or influence these costs....
Source Control Repositories are used in most software projects to store revisions to source code files. These repositories operate at the file level and support multiple users. ...
Developing and analyzing schedules is essential for successfully controlling the time aspect of construction projects. The critical path method of scheduling is by far the most wi...